top of page

Light for IDPs: the RE:Ukraine project

010dark.jpg

Equipping temporary housing with a backup power supply as a part of the RE:Ukraine project (construction of temporary housing for 15 families/50 people). Ensuring energy security and reliability for people, who have lost everything, is our mission within the housing construction project for internally displaced Ukrainians. 2 residential sections will be equipped with electricity generation and storage systems to use green energy during the period of sufficient solar generation and accumulate backup stocks in case of emergency outages.

The required equipment for project implementation:

  • solar panels with a capacity of 20 kW;

  • autonomous power supply systems with the function of accumulation and smart distribution with a capacity of 54 kWh.

Корпуси.png

Project cost:

Section P1 – 2 979 160 UAH

Section 7 – 3 551 240 UAH

 

Let’s share the light with internally displaced persons and make a difference tomorrow for 50 families!

The total amount: 6 530 400 UAH

Estimated project implementation date is January 15, 2024

The report on each case can be found in the ‘News’ section.

The construction plot was provided by the Bucha City Council. Upon the completion of the research, all the facilities constructed on-site will be transferred to the Bucha territorial community.

Learn more about RE:Ukraine project: https://www.reukraine.org/housing-ua

bottom of page